Skip to content Skip to main navigation Skip to footer

Update on Rideau River Pathways

The City of Ottawa has advised that the Rideau River pathways will remain open throughout January with the exception of some periods of flagging. At this time, they anticipate approximately 8 flagged closures of 5 to 10 minute duration for each pathway.